Mechanical Engineering Test Preparations On Industrial Engineering and Production Management Part 1
Buy Now
Test Preparation on Mechanical Engineering Test Preparations On Industrial Engineering and Production Management Part 1
1.
Value engineering aims to
1
find the depreciation value of a machine
2
determine the selling price of a product
3
minimise the cost without change in quality of the product
4
all of the above
2.
In a time study, the rating factor is applied to determine
1
standard time of a job
2
merit rating of the worker
3
fixation of incentive rate
4
normal time of a worker
3.
Gantt chart is used for
1
inventory control
2
material handling
3
production schedule
4
machine repair schedules
4.
The main object of scientific layout is
1
to produce better quality of product
2
to utilise maximum floor area
3
to minimise production delays
4
all of these