Test Preparation on Mathematics Olympiad Class-8 Test Prep-4
1.
P is able to do a piece of work in 15 days and Q can do the same work in 20 days. If they can work together for 4 days, what is the fraction of work left?
A. 7/15
B. 11/15
C. 2/11
D. 8/15
2.
P can lay railway track between two stations in 16 days. Q can do the same job in 12 days. With the help of R, they completes the job in 4 days. How much days does it take for R alone to complete the work?
A. 9(1/5) days
B. 9(3/5) days
C. 9(2/5) days
D. 10 days
3.
P, Q and R can do a work in 20, 30 and 60 days respectively. How many days does it need to complete the work if P does the work and he is assisted by Q and R on every third day?