The rate of payment is made for 100 cu m (per % cu m) in case of
2.
The rate of an item of work depends on
3.
The main factor to be considered while preparing a detailed estimate, is
4.
Pick up the correct statement from the following:
5.
Brick walls are measured in sq. m if the thickness of the wall is
6.
The plinth area of a building not includes
7.
If the formation level of a highway has a uniform gradient for a particular length, and the ground isalso having a longitudinal slope, the earthwork may be calculated by
8.
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
9.
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thickgravel. The box cutting in road crust is
10.
While estimating the qualities for the construction of a building, the correct metric unit is