1. Can you describe what a projection line is?
Projection line can be described as the way in which the earth is displayed on a flat piece of paper.
2. Can you list out the various steps involved in the concreting process?
The main steps involved are as follows:– Batching– Mixing– Transporting and placement of concrete– Compacting
3. List out the reinforcements that are used in the process of prestressing.
Three primary types of reinforcements are used. They are:– Spalling Reinforcements.– Equilibrium Reinforcements.– Bursting Reinforcements.
4. How would you describe the soundness of cement?
It is a property that ensures that the cement does not go through any appreciable expansion or experience any change in volume once it has been set.
5. Explain Fatigue. Can you point out some of the structures that may be subjected to fatigue?
It is the gradual damage to a structure when subjected to cyclic loading. Some of the structures subjected to fatigue are:– Bridges that are heavily loaded– Hydraulic Presse
6. Describe the various types of slump test indications.
Slump tests are initiated to empirically measure the consistency of fresh concrete before it sets.The types of slumps tests are as below:– True Slump– Shear Slump– Collapse Slump
7. Explain the concept of built up area and super built-up area.
Built up area includes the carpet area as well as any space occupied by walls, pillars, and ducts.In most cases, the built-up area is calculated as an excess of 10% of the carpet area.
The super built-up area covers the built-up area as well as any areas that used by building amenities such as life passages, lobby, stairs, gym, clubhouse, etc.
8. What are some of the common roof types?
There are several types of roofs available.Some of the commonly used ones include:– Gable roof– Gambrel roof